Customization: | Available |
---|---|
After-sales Service: | Installation |
Warranty: | Two Years |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
NO. | Block Size | Production Capacity | Photo |
1 | Hollow/Solid Block 400*200*200mm (8 Inch) |
4 blocks in one mold 2560 blocks in 8 hours |
|
2 | Hollow/solid Block 400*150*200mm (6 Inch) |
5 blocks in one mold 3200 blocks in 8 huors |
|
3 | Hollow/Solid Block 400*100*200mm (4 Inch) |
7 blocks in one mold 4480 blocks in 8 hours |
|
4 | Hourdis Block 500*150*200mm |
5 hourdis in one mold 3200 hourdis in 8 hours |
NO. | Item | Power | Technical Information |
A | QMY4-45 Block Machine | 8.8KW | Moulding Cycle: 45 second Machine Weight: 1500KG |
B | JQ350 Mixer | 5.5KW | Capacity: 350L |
Total Power: 14.3KW, Electricity must be 3 phase, 50/60HZ, 380V/440V/220V |
Block Size | 400*200*200mm |
Photo | |
Capacity | 2560 blocks in one day |
Consumption of Cement | 4000KG in one day |
Consumption of Sand and Stone | 36850KG in one day |
Our Service
Pre-Sale
Q1: How can i trust your machine's quality?
A: Our products have been checked and got certification ISO9001, and we have exported to many countries and regions in the world, with good reputation and quality of customer feedback. In addition, every machine is carefully tested before shipment to ensure that the machine is operating perfectly when it comes to your hand.
Q2: What about payment terms?
A: 30% Deposit before production,70% before delivery when machine is ready for shipments.
Q3: How to Cure Blocks?
A: Fresh Blocks are stacked and covered with black plastic to avoid moisture loss. The blocks are then watered daily to create a greenhouse effect, allowing the cement to harden and the blocks to strengthen. Cure your blocks for a minimum of 7 days and allow the blocks to dry to another 7 days before building. This will ensure strong good quality blocks.
Q4:How long is the delivery time?
A:20-30 days after receipt of deposit and molds confirmation from Buyer.